您要查找的是不是:
- Never lift up load beyond rated capacity of crane. 绝对不可提升超过吊臂所能承受的荷载的物件。
- To check the rated capacity of the mooring reel. 检查系泊卷筒额定拉力。
- By full rate, it is 50 cents per word. 全价电报每字50美分。
- No, they are charged at full rate. 不,是按全价收费的。
- Never !ift up !oad beyond rated capacity of crane. 绝对不可提升超过吊臂所能承受的荷载的物件。
- EFR Speech Coder, Enhanced Full Rate Speech Coder. 可改善话音的质量,但只适用于全速率话务信道。
- If you send your cable full rate to Paris, it's20 cents per word, minimum charge one dollar. 如果您全价打海底电报到巴黎,那是每个字20美分,1美元起付。
- Capacity of batteries can reach 100% of its rated capacity when they are fully charged. 充足电的情况下,一次循环内达到额定容量的100%25。
- Rated capacity of 777.8 trillion unit voltammetry, the maximum capacity of 840 MVA, the design head 85 meters. 机组额定容量777.8兆伏安,最大容量840兆伏安,设计水头85米。
- In one embodiment, the lamp is dimmed from its full rated output level to 1 % of its full rated output level. 在一个实施例中,将灯从其全额定输出电平调至其全额定输出电平的1%25。
- With more than 900 MAH high Rated capacity Hermetical rechargeable Lead Acid Battery. 超长寿命电池,高达250次以上循环使用。
- If you send your cable full rate to Paris,it's 20 cents per word,minimum charge one dollar. 如果您全价打海底电报到巴黎,那是每个字20美分,1美元起付。
- If you send your cable full rate to Paris, it's 20 cents per word, minimum charge one dollar. 如果您全价打海底电报到巴黎,那是每个字20 美分,1 美元起付。
- Units rated capacity of 777.8 trillion voltammetry, the maximum capacity of 840 trillion voltammetry, design head 85 meters. 机组额定容量777.;8兆伏安,最大容量840兆伏安,设计水头85米。
- Half day rate applicable for extended check out until 18:00 and full rate applicable for late check out after 18:00. 延迟退房至18:00之前加收半天房费,超过18:00则加收全天房费。
- get sth under control 使…受到控制
- The approximate date when usable capacity will be reached can be calculated by dividing into the usable reserve capacity the rate capacity usaage is growing (per day). 当将达到可用容量时候,这个大概值能够通过分成可用储备容量和可用容量每天增长的速率来计算。
- As lucrative construction steel, steel mills have started to maintain the full rate production, the market increasingly abundant supply, began to increase around the stock. 由于目前建筑类钢材利润丰厚,钢厂纷纷维持饱满开工率生产,使市场货源日趋充裕,各地库存开始增加。
- This paper take the junction panel of the front reinforced beam in the back automobile floor for the example, introduces the drawing die design process, which proves this method simplified the design process ,enhanced the rated capacity. 本文以汽车后地板前加强梁左/右连接板为例介绍了汽车覆盖件拉延模具设计,经过实践应用,证明该方法简化了设计过程,提高了设计效率。