您要查找的是不是:
- flue gas waste boiler 烟道气废热锅炉
- This paper focused on describing planning research of power generation from middle temperature flue gas waste heat in Jiao Zuo cement plant. 本文论述了焦作水泥厂中温烟气余热发电方案研究。
- The design of a waste heat boiler as well as methods concerning the ash deposit,abrasion and flue gas leakage for the petrochemistry s catalytic cracking process are introduced. 阐述了一台利用石化行业催化裂解装置废气的余热锅炉设计过程,重点介绍解决锅炉积灰、磨损和漏烟问题的方法。
- Appliance of heat pipe air preheater in flue gas waste heat recovery of hot blast furnace 热管空气预热器在高炉热风炉烟气废热回收中的应用
- This paper reports that based on theroetical calculation and research, by using heat tube, heat along with flue gas after waste heat boiler,with should emmit into atmosphere, can be recoverd. 对经过余热锅炉后排放到大气中的烟气所带走的热量,应用热管技术进行回收作一个理论上的计算与探讨。
- flue gas waste heat recovery 烟气余热回收
- flue gas waste 烟道废气
- In the economizer, the flue gas hot water heating, and then enter the boiler at the top of the drum inside. 在省煤器内,水受到热烟气的加热,然后进入锅炉顶部的汽包内。
- flue gas waste heat 烟气余热
- For treating industrial emission of chemical engineering, kiln-firing industry, electroplating, metal surface treatment, flue gas, boiler and furnace. 用于化工业、窑业、电镀、金属表面处理、烟道废气、锅炉、燃烧炉等工业废气。
- Abstract: An economic method by which SO2 in a flue gas can be removed using the alkaline matters in bolder water from an industrial boiler house is introduced briefly. 文摘:简要介绍了工业锅炉房利用锅炉水中的碱性物质除去烟气中SO2的经济方法。
- The article introduces the process of improving atomizer burner of boiler and burning condition to reduce the content of nitrogen oxide in flue gas. 本文对太原第一热电厂通过改造锅炉喷燃器,改善燃烧条件以降低烟气中氮氧化物含量的过程进行介绍。
- Steam generation from this hot flue gas is a last resort option. 从这种高温烟道气生产蒸汽是一种最后的选择。
- With this method, the temperatures of flue gas at the furnace and the stovepipe exit of a test boiler were calculated along with the changing of the flow rate of fuel gas. 通过计算得出了一台实验用相变-液浴式锅炉的炉胆出口烟气温度、排烟温度随天然气流量变化的曲线。
- Using the model, numerical simulation of the flue gas temperature and speed deviation in the horizontal sack of the tangentially fired boiler before retrofit was performed. 利用该模型对改造前切圆锅炉水平烟道烟温、烟速偏差进了数值模拟,计算结果和实际运行状况一致,证明了模型的可行。
- The major factors is excess air and flue gas temperature. 影响注汽锅炉运行热效率的主要因素是排烟温度和空气系数,测算分析表明,大部分注汽锅炉二者均超标。
- Application of new type waste boiler in the reforming section is introduced. A three pass quench tube is canceled, the output is increased. 介绍了新型废热锅炉在该厂的应用情况,该新型废热锅炉投产后取消了三通淬冷及相应管线,提高了产量。
- Deodorization of sewage treatment plant, incinerator flue gas. 污水处理场、焚化炉废气除臭。
- The emissions in the flue gas shall comply with EU directives. 烟气散发物应符合欧盟指标。
- A half-wet-half-dry flue gas desulfurization method is proposed. 重点研究了钙硫比、烟气温度、喷水量、加湿喷嘴位置对烟气脱硫效果的影响。
