您要查找的是不是:
- flood control repair 防洪整治
- Parliament appropriated two million pounds for flood control. 国会拨款两百万英镑作为防治水灾之用。
- The historical development of flood control policy in U.S.A. 美国防洪政策演变。
- A flood control protected area means an area protected by flood control works according to flood control standards. 防洪保护区是指在防洪标准内受防洪工程设施保护的地区。
- Flood control planning constitutes the bas is for the control of rivers and lakes and the construction of flood control works. 防洪规划是江河、湖泊治理和防洪工程设施建设的基本依据。
- Regional flood control planning should be subject to the flood control planning for a certain river basin. 区域防洪规划应当服从所在流域的流域防洪规划。
- Finally, it identifies certain pres-sing issues awaiting to be studied and coped with in future flood control works. 最后,提出了面向未来防洪事务的亟待研究与解决的若干问题。
- But with more rains on their way and with difficulties in flood control, the ordeal is far from over. :主播:自从五月以来,洪水与暴雨已经夺走了超过500条人命,最后在一些地区总算降到警戒线以下。
- The Chinese government has increased investment in flood control project construction since last year. 去年以来,国家加大了对防洪工程建设的投入。
- In New Orleans, when flood controls failed, so did law and order. 在新奥尔良,当洪水失去控制的时候,法律和命令也失去了约束。
- The construction of flood control works should be incorporated into the national economic and social development plan. 防洪工程设施建设应当纳入国民经济和社会发展计划。
- The flood control dykes and dams built in the period totaled 5,129 km - 17.7 times the 1949 figure of 289 km. 建成防洪堤坝5129公里,是1949年289公里的17.;7倍。
- Reservoirs should keep adequate storage capacity for flood control according to the requirements of flood control planning. 水库应当按照防洪规划的要求留足防洪库容。
- Those reclaimed lakes should be put in order according to the standards set by the state for flood control and restored from farmland in a planned way. 已经围垦的,应当按照国家规定的防洪标准进行治理,有计划地退地还湖。
- Flood control funds shall be raised according to the principle of combining government input with rational payment by beneficiaries. 防洪费用按照政府投入同受益者合理承担相结合的原则筹集。
- The bamboo and log rafting in river courses should not affect the safety of flood passage and flood control works. 在河道中流放竹木,不得影响行洪和防洪工程设施的安全。
- The construction if flood control works should be incorporated into the national economic and social development plan. 第三条防洪工程设施建设,应当纳入国民经济和社会发展计划。
- IGMP Solution for Network Load Balancing Switch Flooding Control. 网络加载平衡切换流控制的IGMP分辨率。
- Amendment to flood control planning should be subject to the approval from the original approval organ. 修改防洪规划,应当报经原批准机关批准。
- Hydroelectric power and flood control and irrigation are possible without building monster dams. 水利发电,治理洪水以及灌溉即使不建大型水坝也是可能的,不一定非要建大坝。