您要查找的是不是:
- fabrication cost engineer 造价工程师
- The cost engineer is the fresh combatant of Chinese project cost management. 造价工程师是我国造价工程管理工作的生力军。
- The fabrication cost mode by project quantity bill is popularly practiced in the fabrication cost management of international projects. 工程量清单计价模式是国际工程造价管理的通行做法。
- The devices have many advantages, wider operating bandwidth, high power, lower fabrication cost and the miniaturization technology of the Microwave Power Module (MPM). 它具有宽频带和大功率的优点,制造成本低,且可以与微波功率模块(MPM)组合实现小型化;
- Implement the project fabrication cost of stage and is controlled and can be divided into three stages in project: Control at stage of the bid , control and completing the control at stage of settlement at stage of construction. 工程实施阶段的工程造价控制可分为三个阶段:招标阶段的控制、施工阶段的控制和竣工结算阶段的控制。
- The construction stage entire process construction cost control is refers to construction cost engineer in the entire construction stage,to project construction cost whole implementation dynamic,beforehand,driving construction cost control. 施工阶段全过程造价控制是指造价工程师在整个施工阶段,对工程造价整体实施动态的、事先的、主动的造价控制。
- To these accurate woodwork lathes, most of machine tool of their processing adopt machining center and more accurate device fabrication costing an arm and a leg. 对于这些精密型木工机床,它们的加工母机多数采用价格昂贵的加工中心和更精密的设备制造。
- project fabrication cost speciality 工程造价专业
- fabrication cost by project quantity bill 工程量清单
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Westney, Richard E., Total Cost Management: AACE-I Vision for Growth, [J], Cost Engineering, October 1992. 戚安邦,建设项目全过程造价管理理论与方法(全国造价工程师继续教育教材),[M],天津人民出版社,2004年。
- fabrication cost mode by project quantity bill 工程量清单计价
- Dragoo,R.E., and Rick A.Letendre, Manage Cost in Real Time, [J], Cost Engineering, Vol.36, No.2, February 1994. 余敬,李凤兰,传统管理范式与管理新范式的比较,[J],技术经济与管理研究,2002年第三期。
- Westney, Richard E., Project Management Trends for the 90’s, [J], Cost Engineering, Vol. 33, No. 10, October 1991. 余敬,李凤兰,传统管理范式与管理新范式的比较,[J],技术经济与管理研究,2002年第三期。
- Registered Cost Engineer Management Method 注册造价工程师管理办法
- The Diathesis bom by a cost engineer 论造价工程师应具备的素质
- In-situ synthesis has fine soakage and cleaning interface, hut fabricating cost is much higher and unfit for large-scale produstion. 原位反应合成法具有浸润性好,界面清洁等优点,但制备工艺成本高,不适于规模化生产;
- Cost engineer how to hold the future in hands 造价工程师如何把握未来
- His dress is made of a wash and wear fabric. 他的衣服是用洗后不用烫的纤维衣料做的。
- The cost of repairing the fabric of the church was very high. 修理教堂结构的花费非常大。