您要查找的是不是:
- This article makes a systematical analyse of and discusses some engineering cost information, influence factor, system function and network platform. 本文对工程造价信息化的影响因素、系统功能、网络平台等问题做了系统地论述和分析。
- Discussion on the Construction of Engineering Cost Information 论工程造价的信息化建设
- Accumulation Engineering Cost Information to Application to Design 工程造价资料的积累在设计工作中的应用
- Accumulation and Application of Engineering Cost Information 工程造价资料的积累和运用
- The engineering cost is listed independently . 设计费单独列出。
- Providing correct purchase cost information. 提供正确的采购成本信息。
- The engineering cost is listed independently. 设计费单独列出。
- engineering cost information 工程造价信息
- Does the total price of all equipments include engineering cost ? 所有设备包括了设计费吗?
- Do the total price of all equipment including engineering cost? 所有设备价格包括设计费了吗?
- Verify that all resources with cost information are assigned to tasks. 验证是否已经将所有具有成本信息的资源分配给任务。
- In general, cost information is needed for three different purposes. 一般说来,人们出于三个原因需要掌握成本资料。
- Sichuan Chuangxin Construction Engineering Costs Auditing Go., Ltd. 四川创信建设工程造价审计事务所。
- For queries involving only inequality predicates, it returns less accurate cost information. 对于只涉及不等谓词的查询,它将返回不太准确的开销信息。
- By enhancing the controllability,P2SP mode can provide high efficiency and low cost information service. 通过提高可控性,P2SP模式可以提供高效率、低成本的信息服务。
- The paper introduces computer application in engineering cost management and the prospect. 介绍了计算机在工程造价管理中应用的现状及前景。
- This system requires confidence in the cost information,and this is reinforced by cost auditing. 原译:这种系统要求对成本资料有把握,它可以通过审计成本得到强化。
- This paper is a presentation of measures adopted to control engineering cost in design, bid and construction. 针对目前我国工程造价管理存在的问题 ,提出从设计、招投标、施工三个阶段进行工程造价控制的论点
- For the proxy overlay, we choose to distribute and maintain the cost information using the distance vector protocol. 对于代理覆盖,我们选择采用距离向量协议来分发和维护代价信息。
- During commercial\|cale trial,the No.9 sliding body was monitored.It reduced engineering cost of about 4 million yuan. 在工业试验期间,仅对该矿9号滑体进行了监测,经设计可节省工程费大约400万元。
