您要查找的是不是:
- Construction stage project change to highway engineering construction cost influence and control 施工阶段工程变更对公路工程造价的影响及控制
- Shallowly Discussion of the Project Variation Visa Management in Architectural Engineering Construction Stage 浅谈建筑工程施工阶段工程变更签证管理
- engineering construction stage 工程施工阶段
- Risk Analysis of Engineering Construction Project. 工程建设项目的风险分析。
- JILIN PROVINCE ENGINEERING CONSTRUCTION CO., LTD. 吉林省工程建设有限公司。
- CHEN Airong,XIANG Haifan.Aeroelasticity of long-span rigid frame bridges under construction stage[J].Journal of Vibration Engineering,1999,12(4):535. [1]陈艾荣;项海帆.;大跨刚构桥梁气动弹性试验及分析[J]
- China Civil Engineering Construction Company(Macau) Ltd. 中国土木工程(澳门)有限公司。
- The management of design alteration involves various aspects such as engineering quality,progress and investment,and prongs the whole process of construction stage. 设计变更的管理涉及工程的质量、进度、投资等多方面,而且贯穿于施工阶段的整个过程。
- China petroleum engineering construction corporation. 中国石油工程建设公司。
- Therefore,it is important for engineering construction to stu... 这一研究成果具有重要的工程实际意义。
- Considering the present situation of shield tunneling on Beijing metro, the paper describes the construction stage division and the main points of engineering quality control for shield tunneling. 结合北京市地铁隧道盾构法施工的现状,对施工阶段的划分及各阶段的质量管理与控制要点进行阐述。
- The preliminary practice on eco-agriculture engineering construction. 生态农业工程建设初步实践。
- Main working scope: offshore engineering construction and installation. 主要工作范围:海洋工程建造与安装。
- Design stage and construction stage deeply influence the cost of real estate project. 勘察设计和工程施工对房地产开发项目的成本费用影响较大。
- Civil Engineering Construction; Wiring, plumbing and equipment installation. 土木工程建筑;线路、管道和设备的安装。
- No construction work shall be carried out on Saturdays, Sundays and Public Holidays during construction stage of the Project. 建造工程期间,不能在星期六、星期日及公众假期期间施工。
- How in the world was this marvel of engineering constructed? 这种工程上的奇迹究竟是怎麽制造出来的?
- The wind resistance analysis is made for pylon of the south navigable cable-stayed bridge of Hangzhou Bay Bridge at construction stage. 摘要对杭州湾大桥南通航孔斜拉桥进行桥塔施工架设期间的抗风分析。
- The effects of caisson foundation deformation on wind-induced buffeting response at twin-cantilever construction stage of cable-stayed bridge are studied in this paper. 探讨了地基变形对桥塔沉井基础位于土层之中的斜拉桥施工双悬臂结构风致抖振反应的影响。
- In order to make full use of the cables' mechanical property and save materials, it is necessary to keep the value of cable force unchangeable during each construction stage. 为了充分发挥拉索的力学性能,节约物资,应力求扣索的张拉力在每个施工段相等。