您要查找的是不是:
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通过监视系统需求和新的工程变化订单来更新生产订单。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- Is a formal engineering change procedure implemented? Briefly describe the process. 是否实施工程更改操作?简要描述该过程。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及时处理工程变更通知,将精确的、有效的成本执行到生产工作中。
- General data includes engineering change level, phase covered (prototype, pre-launch, production), key contact, part/process step number, process name/operation description. 基本数据包括工程更改等级、所处阶段样件试生产生产、主要联系人、零件/过程步骤编号、过程名称/作业描述。
- Engineering Change Request: A request or suggestion to Engineering for an improvement in a process or procedure.Eficient Consumer Response: A term used to describe a way of doin. 工程技术方面改变要求,从工程技术方面提出的针对流程或规程的调整。有效客户需求:是用于描述在零售行业如何招徕销售合作伙伴。
- Ultimately, the risk must be some people assume, financial engineering change only risks and benefits of different preference in the allocation of customers. 归根到底,风险总要有人承担,金融工程改变的只是风险和收益在不同偏好客户之间的分配。
- Based on modern information economics, dissymmetry information phenomenon between main bodies of project and its influences on engineering change risks are analyzed. 摘要运用现代信息经济学的信息不对称理论分析了建设项目主体之间的信息不对称现象及其对工程变更风险的影响。
- The main advantage of our design methodology is that it can be easily integrated into the ECO (Engineering Change Order) stage in the existing ASIC design flow. 我们所提出之设计方法的主要优点,在于它可以整合于现有ASIC设计流程中的ECO部分。
- Control of the whole process: IPQC check various items of the whole process, including materials, production, operations, engineering change and OQC shiping inspection. 一).;全制程参与管控:通过IPQC对各生产制程的使用材料、生产条件、作业内容、工程变更的确认以及产品出货前OQC的检查,以确保产品品质。
- This year, however, Ferrari are lucky in that each driver is allowed one unscheduled engine change without penalty. 今年,无论如何,法拉利非常幸运,他们的每一位车手被允许不定期的更换一次引擎而不用遭受处罚。
- Maintenance of the Shop Order, achieve Customer Spec changes and Product engineering changes. 产品定单的维护,完成客户规格更改和产品工程更改;