engineering eost的用法和样例:
例句
- The paper introduces computer application in engineering cost management and the prospect.
介绍了计算机在工程造价管理中应用的现状及前景。 - The design is a construction originally, strengthen the management to design the stage, is rey work to control the engineering cost.
设计是建设之本,加强对设计阶段的管理,是控制工程造价的重点。