您要查找的是不是:
- Point at the aspect of serious abrasion wear of down draft fan wheels in 75m 2 sintering plant,E-Cheng I &S Co. ,some research were conducted. 针对鄂钢75m 2 烧结机抽风机叶轮磨损严重的情况,进行了分析研究。
- Study and Practice on 265 m~2 Sinter Machine of Baotou Steel Corp. 包钢265m~2烧结机工序优化研究及生产实践
- It bought another secondhand blast furnace and a sinter machine from Arbed in Luxembourg. 它还从卢森堡的一家公司购买了一座二手高炉和一个烧结机。
- In this paper, the structure and features of several kinds usual end seal in sintering machine was compared. 就国内常见的几种烧结机端部密封装置的结构、特点进行了比较。
- Several failures using ESP at the sintering machine tail are analysed, and the corresponding ways are put forward. 对烧结机机尾电除尘器在使用过程中经常出现的几种故障进行分析,并提出相应的解决方法。
- STUDY ON SINTERING TEST PROPORTIONING HIGH GRADE BRAZILIAN CRUDE ORE AND SERPENTINE IN 300m~2 SINTERING MACHINE OF MAANSHAN IRON & STEEL Co. ,Ltd. 马钢300m~2烧结机配用巴西高品位粗粒粉矿及蛇纹石烧结试验研究
- Air leakage occuring at various Iocations of No. 2 Sintering machine was measured before and affer its intermediate re-pairs. 系统测定了2号烧结机中修前后各部位的漏风情况;
- The reasons of high energy consumption on sintering machine No.2 at Xiangtan I &S Co were discussed from the results of heat balance test. 摘要根据湘潭钢铁公司(以下简称湘钢)2号烧结机能耗现状和热平衡测试结果分析了该烧结机能耗高的原因。
- The machine must break down at this busy hour. 正忙的时候,机器偏偏又坏了。
- Frontal thunderstorm over the field, up and down drafts up to40 knots. 锋面雷雨过境,上升下降气流达40海里每秒。
- The comprehensive technical reformation to raise the utilization factor of 1# sintering machine of Xuan Steel is introduced as well as its good effect. 介绍了宣钢一烧1%23烧结机提高烧结机利用系数的综合技术改造措施,改造后取得了较好效果。
- Frontal thunderstorm over the field, up and down drafts up to 40 knots. 锋面雷雨过境,上升下降气流达40海里每秒。
- The reasons of high energy consumption on sintering machine No.2 at Xiangtan I&S Co were discussed from the results of heat balance test. 摘要根据湘潭钢铁公司(以下简称湘钢)2号烧结机能耗现状和热平衡测试结果分析了该烧结机能耗高的原因。
- Coal-Fired Down Draft Net-Belt Annealing Kiln 倒焰式燃煤网带退火窑
- Aimed at the existing problem in electronic belt scale for sintering machine of TISCO. , the author introduces a late - model technique and describes practical effect. 针对太钢烧结机配料电子皮带秤存在的问题,介绍了一种新型的技术方案,并叙述了实施效果。
- The output is increased and quality improved by reforming equipments of sintering machine and adjusting process parameters to quicken vertical sintering. 介绍了石钢以提高垂直烧结速度为突破口,通过对烧结机的设备改造及工艺参数调整,提高了烧结矿的产量和质量。
- The situation and using effect of the sintering machine's main draw fan enlarged from D2300-11 to D2800 in the Anyang Iron &Steel Group Co.Sinter Plant are introduced. 介绍了安阳钢铁集团公司烧结厂烧结机主抽风机由D2300-11风机扩容改造为D2800风机的情况和使用效果。
- The paper introduced the characteristics,principles and running situations of equipment of the plane circulation sintering machine waster heat utilization. 介绍了平面循环烧结机余热利用装置的特点、原理和运行情况。
- ABRASION WEAR OF WHEELS OF DOWN DRAFT FAN AND ITS REPAIR 烧结抽风机叶轮磨损与修复
- In order to reduce sinter machine the nose airplane tail air leak rate,designed the software seal,in agglutinated in the cup carries on the experiment,the effect was remarkable. 为了降低烧结机机头机尾的漏风率,设计了软体密封,在烧结杯中进行试验,效果显著。