您要查找的是不是:
- developing test vectors 开发测试向量
- Key Responsibilities Develop test lans. 开发测试计划。
- This paper introduce how to according to the instruction system of 8087 co processor to develop the function test vector of 8087 on SENTRY test system. 文章介绍了如何根据8087协处理器的指令系统编写8087的测试图型,进而开出其测试程序。
- A new BIST structure with the method of test vector generation based on a controlled LFSR is proposed. 摘要本文提出了一种基于受控线性反馈移位寄存器(LFSR)进行内建自测试的结构及其测试矢量生成方法。
- This paper discusses a crosstalk delay maximization algorithm, and by using revised FAN algorithm test vectors are generated. 摘要探讨了一种串扰时延最大化算法,并且利用被修改的FAN算法,生成测试矢量。
- BIST with a controlled LFSR can skip pseudo-random test vectors not contributing to the fault coverage, thus the length of test vectors and the time of test are reduced. 使用受控LFSR可以跳过伪随机测试序列中对故障覆盖率没有贡献的测试矢量,从而达到减少测试矢量长度,缩短测试时间的目的。
- The experimental results show that for the circuits having many inputs,the length of test vectors generated by this method is much shorter and the hardware cost is smaller. 测试生成后,再将一维的测试向量转换成瞬态电流测试需要的测试向量对施加到被测电路。 实验表明,对于输入端较多的电路,该方法生成的测试向量序列长度极大的减少,硬件开销也较小。
- Have ability to develop test plan of new project, familiar with correlative standard of internal or international. 具有一定开发新产品测试程序的能力,熟悉相关的国内或国际标准。
- As to be groundwork, some applications about BST in board test, test process and test vector generation arithmetic were enforced. 在此基础上,重点讨论了边界扫描技术在板级测试领域的相关应用,并对板级测试过程和矢量生成算法进行了介绍。
- You can't develop test suites that will survive and be useful in the next release without clear and realistic planning. 不能在缺乏明晰且实际的计划的情况下,开发在下个发行版中继续有效并适用的测试套件。
- Through this VeriTest service, Lionbridge provides consulting on the entire partner certification lifecycle, from creating marketing benefits to developing test tools. Lionbridge可以通过VeriTest服务在整个合作伙伴认证生命周期(从获取营销利益到开发测试工具)中提供咨询。
- DescriptionIn this position, you will be required to design and develop test cases for VMM and windows/Linux drivers on ...... ... 公司名称:上海微创软件有限公司北京分公司工作地点:上海市发布时间:2009-7-27
- Responsibilities: 1. Develop, test and deliver batch scripts for SCM applications using Unix shell, Perl, XML, E...... ... 公司名称:广州锦田顾问服务有限公司工作地点:广东省深圳市发布时间:2009-4-4
- This paper uses the theory of Maximal Aggressor Fault model(MAF),and discusses a crosstalk delay maximization algorithm,and generates test vectors by using revised FAN algorithm. 利用MAF模型的基本思想,探讨了一种串扰时延最大化算法,并且利用被修改的FAN算法,生成测试矢量。
- For substituting the test vectors generated by the circuit under test for the pseudo-random vectors supplied by a LFSR,this paper proposes an ATPG algorithm based on genetic algorithm. 本文针对由被测电路自己产生测试向量取代LFSR伪随机向量,提出一种基于遗传算法的自动测试向量生成算法。
- Non-programmers can be well served by data-driven approaches that let them develop test cases simply by entering test planning ideas into a spreadsheet. 数据驱动方法使非程序员能很好的工作,因为它使他们能通过简单地把测试规划放入电子表格中来开发测试用例。
- Producing algorithm of testing vectors contains:Pseudo-exhaustive method, D algorithm, Main access sensitizingmethod, Fault dictionary method. 测试向量生成算法包括: 伪穷举法, D 算法, 主要通路敏化法, 故障字典法。 故障仿真的方法包括: 并行故障仿真和演绎故障仿真。
- Assign part number, develop test process flow in CIM system, BOM preparation in SAP system per customer requirements for any new product and production release. 分配料号,在CIM系统中维护测试流程,根据客户对新产品和生产的要求,在SAP系统中维护BOM等信息。
- There are many career growth potentials for any excellent individual.QA engineers will develop test plans and test specifications, develop automated test suites, perf ... 美国gomez公司北京分公司急聘测试工程师(职位在北京)职位描述We are a new company and everyone is at the same starting line.
- Be able to develop testing program to determine this relationship for particular corn varieties. 进行相关测试,确定此种关系对特定玉米品种的影响。
