您要查找的是不是:
- The whole geometric structures of combustor,combustion chamber and furnace tube in delayed coking furnace were accurately calculated by the whole-coupling method. 采用分区耦合的计算方法,实现了对工业焦化炉从燃烧器、炉膛、炉管整体几何结构的仿真,并且对焦化炉内流动、燃烧和传热全部工艺过程进行了模拟。
- Capacity expansion of delayed coke furnace 焦化加热炉扩能改造
- Infrared Monitoring Tube Temperature of Delayed Coking Furnace 延迟焦化油品加热炉炉管温度的红外监测
- Advanced Control System Development for the Delayed Coke Furnace 焦化加热炉先进控制系统
- Predictive Functional Control of Outlet Temperature in Delayed Coking Furnace 焦化加热炉出口温度的预测函数控制
- NUMERICAL SIMULATION OF TURBULENT FLOW AND COMBUSTION IN A DELAYED COKING FURNACE 延迟焦化加热炉内湍流流动和燃烧的数值模拟研究
- NUMERICAL SIMULATION OF FLUID FLOW, COMBUSTION AND HEAT TRANSFER PROCESSES IN DELAYED COKING FURNACE 延迟焦化炉内流动、燃烧和传热过程数值模拟
- delayed coking furnace 焦化加热炉
- Corrosion in delayed coking unit is introduced, especially the corrosion of heating furnace is introduced and analyzed in detail. 介绍了焦化装置的腐蚀情况,特别是对加热炉空气预热器的腐蚀做了详细的分析,并提出了预防措施。
- Elimination and inhibition of foam in the oil in delayed coking plant. 用于延迟焦化装置,消除和抑制油品中的泡沫。
- Corrosion in delayed coking unit is introduced, especially the corrosion of heating furnace is introduced and analyzed in detail. In addition, prevention measures are also given in the paper. 介绍了焦化装置的腐蚀情况,特别是对加热炉空气预热器的腐蚀做了详细的分析,并提出了预防措施。
- Two controllers were designed,one was coking furnace controller,the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- This complex uses high-sulfur residuum as raw material with processes of delayed coking, and hydrodesulfurization. 该联合装置采用高含硫渣油为原料,并由延迟焦化、加氢脱硫等工艺生产精制油品。
- Two controllers were designed, one was coking furnace controller, the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- Finally, the energy consumptions in Jinan Company under the conditions of with and without delayed coking unit have... 通过比较,分析了原油性质和加工手段对炼油能耗的影响,找到了济南分公司炼油综合能耗偏高的原因。
- The experience to use pure blast furnace gas in coke furnace firing and toasting in Chengde Coking and Gas Co. 介绍了承德焦化煤气股份有限公司在焦炉点火烘炉中使用纯高炉煤气的经验。
- The protection measures to high temperature adopting in production of coking furnace are introduced. 介绍承钢焦化厂在实际生产中对焦炉设备高温防护采取的措施。
- The result indicated that the hydrotreated delayed coking naphtha was qualified for reforming feedstock, its blending ratio could be up to 35%. 结果表明,焦化汽油加氢精制后可作重整原料,且掺炼比可达35%25。
- The application situation of new type suspender shape thermal insulation technology on coke drum in delayed coking unit was recommended. 介绍了新型背带式保温技术在延迟焦化装置焦炭塔上的应用情况。
- Directory Digital Control is introduced in the article, and Coking Furnace Intelligent Control System is designed and realized according to DDC. 计算机控制系统的控制水平也已经大大提高。 本文比较详细的介绍了一种直接数字控制系统的计算机控制方案,并应用此控制方案设计并实现了东郊煤气厂的焦化炉压力控制系统。
