您要查找的是不是:
- There is a large scale of dynam-relaxed rock mass lies in Daliushu dam site. 大柳树坝址区存在大面积、大范围的岩体松动破坏现象。
- There is a large scale of dynam-relaxed rock mass lies in DaLiushu dam site of Yellow River. 大柳树坝址区存在大面积、大范围的岩体松动现象。
- There is a large scale of dynam-relaxed rock mass lies in DaLiushu dam site of Huanghe River. 黄河黑山峡大柳树坝址区存在大范围的岩体松动破坏现象,其主要特征是岩体应力释放,结构面张开,密度显著下降。
- The study result provides an important reference foundation for selecting the dam site and damline of Guandi waterpower station of Yalongjiang. 其研究成果为雅砻江官地水电站坝址及坝线的选比提供了重要参考依据。
- Systematic pre-study of these problems is very important for selection of dam site, lay out of engineering project, timelimit, cost and safety, etc. 系统深入地开展这些问题的研究,将对选坝、工程布置、工期、造价和施工运行安全以及岩体工程地质力学理论的发展都有十分重要的意义。
- The upper reservoir overflow dam of Yangjiang pumped storage power station shows the characteristics of high waterhead,narrowing river bed in dam site and steep slope. 针对阳江抽水蓄能电站上库溢流坝具有高水头、坝址河床狭窄、坡度陡峭等特点,通过水力模型试验研究优化了溢流坝及其消能工体型,解决了溢流坝的消能问题。
- Except the method of nature electric field,we used DB-3 popular dam seepage detection device of flow field method to reconnoiter around Jiangya dam site. 在对江垭水库大坝物探勘查工作中,除运用了自然电场法等常规查漏方法外,还采用了流场法DB-3普及型堤坝渗漏检测仪进行勘查。
- There are two sets of vertical shearing planes and one set of relaxed fissures dipping towards the river course in the rock mass at the Xiaowan dam site. 小湾岩体存在两组垂直结构面和一组倾向河道的卸荷裂隙。
- The Shuibuya hydroelectric project will be built in gorge morphology on Qingjang River,the gravitation is key factor which decides whether the rock in dam site is stable or not. 水布垭水电枢纽拟建于清江干流深切峡谷地段,重力是决定坝址区岩体稳定与否的关键因素。
- In the small, dusty town closest to the dam site - but out of the flood zone -a new restaurant has just opened, in anticipation of hungry construction workers and their families. 靠近大坝工程建地淹没区以外一处沙尘漫天的小镇;一间新的餐馆才刚开张;瞄准了建筑工人与他们家人的胃.
- This paper analyses "Taili" typhoon storm flood above Shanxi Reservoir dam site of Feiyun River Vally,reservoir flood operation and flood control benefit. 对飞云江流域珊溪水库坝址以上“泰利”台风暴雨洪水及水库洪水调度和防洪效益进行了分析。
- The principles of arch dam foundation treatment design are expounded in combination with engi-neering geology condition at dam site of Ertan Hydroelectric Plant. 结合二滩水电站坝址区工程地质条件,阐明拱坝基础处理设计的原则,全面介绍了基础处理设计中采用的主要工程措施和先进技术。
- The major engineering geological problems of US dam site of Laokou Complex include relatively soft base rock lithology,low shear strength and bearing capacity. 老口枢纽工程上坝址主要的工程地质问题为坝址基岩岩性较软,抗剪强度、承载力偏低。
- Visit to Three Gorges Dam Site. 游览三峡大坝。
- Except for the Tenasserim River, the other four dam sites are on the Salween River. 除德林达依河外,其余四个水库坝址都在萨尔温江。
- The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head. 蓄水位选择、坝址选择、枢纽布置、建筑物设计优化、施工导流与工期等是低水头河床式电站设计的重要内容。
- Geological assessment of a dam site is quite important for the dam safety. From the viewpoint of geology, geological setting and its structure is the key to judge the site safety for a dam. 坝址的地质评价是大坝安全的一项重要工作,从地质学观点出发,地质组成及结构是评价大坝安全的关键。
- According to topographical features, the valley shape, Quaternary overburden thickness, and fault rock crusher factors we can identify the downstream dam site for the proposed dam site. 根据地形地貌、河谷形态、第四系覆盖层厚度、断层因素和岩体破碎程度等综合确定宜选择下坝线为拟建坝址。
- Over the past two years Stanley collected data at dam sites, both before and after their removal, along the Baraboo River and Koshkonong Creek in Wisconsin. 在过去两年内,史坦利于威斯康新州内的巴伯若河及哥许哥侬溪沿岸,在即将拆除的水坝场址收集资料,并于拆毁后再进行一次调查。
- The dam burst under the weight of water. 那水坝在水的压力下决口了。