您要查找的是不是:
- Explain the strengths and weaknesses of critical path analysis. 解释关键路径分析的优缺点。
- Much of the knowledge and many of the tools and techniques for managing projects are unique to project management, such as work breakdown structures, critical path analysis, and earned management. 管理项目所需的许多知识和许多工具和技术都是项目管理独有的,如工作分解结构、关键路径分析和实现价值管理。
- Critical Path Analysis for Structure Optimization of Workflow 面向工作流结构优化的扩展关键路径分析
- critical path analysis 统筹分析法, 关键路线分析法
- The arrow diagram does not indicate critical path. 箭线图表不注明主要的路径。
- Basic project planning, critical path, critical chain, or PERT analysis may mitigate such failings. 基本的项目计划、关键路程、重要链子,和计划评审技术分析也许会减低失败的几率。
- Critical path and critical activities: time management principles. 关键路径与关键作业的权衡之道:时间管理法则。
- Path analysis and Cobb-Douglas production function were used. 使用路径分析与柯布-道格拉斯生产函数进行测定。
- Show the critical path for your project to quickly find problem tasks. 显示项目的关键路径:以快速查找有问题的任务。
- Identifying and discuss critical path items on each job before mobilization. 动员进厂之前,辨别并讨论每项工作的关键路径项。
- On our most projects Critical Path Method( CPM) is used for scheduling. 在我们的大多数工程项目中都采用“统筹法”(关键路线方法,简称CPM)排计划。
- The critical path method was originally developed to solve scheduling problems in an industrial setting. 关键路线方法最初的发展是为了解决一项工业安装的安排问题。
- Path analysis was used to construct the model of intentions to buy NaFeEDTA fortified soy sauce. 应用通径分析构建铁强化酱油购买意向模型。
- Together with load and path analysis, you get a pretty complete picture of how to find and fix the bottlenecks. 通过加载和路径分析,您可以获取一个如何发现和修复瓶颈的相当完整的描述。
- The path analysis and regression analysis results also showed that the content of the wet gluten and the sta... 通径分析与回归分析表明,湿面筋含量与面团稳定时间对速冻饺子质量的影响最大。
- The key is whether you are sticking to the "critical path" when you organize your time, work space, and goals. 关键是当你安排自己的时间、工作范围以及工作目标时,你是否坚定不移地走在一条“至关重要的道路”上。
- Path analysis reveals that objective factors have influences on GWB through subjective factors. 路径分析揭示,客观因素通过主观因素间接地影响幸福感。
- The key is whether you are sticking to the critical path when you organize your time,work space,and goals. 关键是当你安排自己的时间、工作范围以及工作目标时,你是否坚定不移地走在一条“至关重要的道路”上。
- The correlation and path analysis of 9 main agronomic characters in 30 celery varieties (lines) were studied. 摘要以30个芹菜品种(系)为试验材料,对其9个主要农艺性状进行了相关和通径分析。
- Smetana, F. O.,“Turbojet Engine Gas Path Analysis A Review,”AGARD Conference Proceedings, No. 165, 4-5 April, 1974. 陈大光;张赫然;“用气动热力参数对发动机故障进行诊断与定位的实用方法;”北京航空航天大学硕士论文第二章;1989年.
