您要查找的是不是:
- construction of pilot hole 钻孔施工
- Pneumatic hammer is optional to carry out the construction of pilot bore in gravels, rocks and backfills. 可选配气动冲击锤,用于卵砾石、岩石和回填杂土中导向孔的施工;
- Pneumatic hammer is optional to carry out the construction of pilot bore in gravels rocks and backfills. 可选配气动冲击锤,用于卵砾石、岩石和回填杂土中导向孔的施工;
- construction of pilot production base 中试生产基地建设
- Managing Error At Center Of Pilot Training Program. 管理差错处于飞行员训练计划中心。
- The building is a construction of wood. 这是木质结构的建筑。
- The next step is to plan construction of the highway. 下一步就是制定公路的建设计划。
- Record of Pilot Time (Do not write in the shaded areas. 驾驶员飞行时间记录(阴影区域不填)
- There was a great outcry about the construction of the new airport. 公众强烈反对修建该机场。
- As per the contract, the construction of factory is now under way. 根据合同规定,工厂的建设正在进行中。
- The TV tower is by far the largest construction of our country. 电视塔明显地是我国最大的建筑。
- A pierced pilot hole shall be the first station of a progressive die to ensure proper pitch from die setup. 在连续模第一站应冲导正孔确保模具结构有固定的步距。
- By comparing the acoustic wave impedance with the VSP (vertical seismic profile), the reflectors of the CCSD pilot hole have been analyzed. 分析结果表明(1)岩性间波阻抗差异产生反射波,如榴辉岩与副片麻岩之间波阻抗差异;
- The local government authorized the construction of a new airport. 地方政府批准建造一个新机场。
- The citizens urged for the construction of a new hospital. 市民们强烈要求建造一个新医院。
- The company has tendered for the construction of the new bridge. 这家公司已投标承建这座新桥。
- A zero-offset VSP observation was carried out with a 6-level 3-component geophone at the pilot hole of Chinese Continental Scientific Drilling (CCSD). 用六级三分量检波器在中国大陆科学钻探先导孔中实施了零偏VSP测量。
- TYZ series raise borers play an important role in the operation of drilling pilot hole and reaming ventilation raise, fill raise or pipe pass etc. TYZ系列天井钻机在压钻导向孔和拉扩通风井、充填井或管道井等的作业中起着至关重要的作用。
- Design and construction of pilot projects for levee-bank collapse treatment 崩岸整治新技术试验工程的设计与施工
- Firms were invited to tender for the construction of the new motorway. 各公司应邀投标承建新高速公路。
