collapsible loess ground的用法和样例:
例句
- Owing to the wet ground at all railway zones of ocher, construction facing severe challenges, many of the problems are universal.
由于该段铁路全部处于湿陷性黄土区,工程建设面临严峻挑战,许多都是世界性的难题。 - For special emphasis, the water-bearing state of collapsible loess must be considered when dealing with the effects of earthquake action to engineering.
特别强调地震作用对工程影响必须考虑湿陷性黄土的含水状态。