您要查找的是不是:
- calculating price by bill 清单计价
- This paper describes the share of risk on material prices under the mode of pricing by bill of quantities and the necessity of enhancing risk management on material prices by the contractor. 阐述工程量清单环境下材料价格风险的分担以及承包商加强材料价格风险管理的必要性。
- Pricing by bill of quantities conforms to the principle of fair competition,and helps improve the level of engineering pricing and finally get integration with international practice. 实行工程量清单计价,符合公平竞争的原则,同时有利于提高工程造价水平,最终实现与国际惯例接轨。
- In order to meet the requirement of increasing fierce competition in architectural engineering market,the method of pricing by bill of quantities is putting into practice gradually over China. 为了顺应竞争日益激烈的建筑市场的发展要求,工程量清单计价方式震在全国逐步推行。
- This book is written by Bill Gates. 这本书是比尔·盖茨写的。
- Barbarians led by Bill Gates II. 比尔·盖茨的野蛮兵团2。
- They've increased the price by 50%. 他们已经把价格提高了 50%25。
- This book was written by Bill Gates. 这本书是由比尔盖茨写的。
- We're ready to reduce the price by. 咱们准备减价百分之五。
- This is a book written by Bill Gates. 这是比尔·盖茨写的一本书。
- The buyer will pay the price by sight draft. 买方将用即期汇票付款。
- Can you cut the price by 10 percent? 你可以打九折吗?
- We have reduced the price by 20 percent. 我们已降价20%25。
- We're ready to reduce the price by 5%. 我们准备减价百分之五。
- So how about reducing the price by 5%? 你看将价格下调百分之五怎么样?
- IF U RDU UR PRICE BY 5PCT, V WL ODA 1000 SETS. 日本产的样式相似的产品正在这里销售,且售价要低得多。若你方能降价5%25,我方将订购1000台。
- On times Replied by bill Beanstalk International Bilingual School. 青苗国际学校。
- Led by Bill Mallon, a shoulder surgeon in Durham, N.C. 其实,如果按照一个最基本的标准,马尔代夫也并不是最差劲的。
- The plaintiffs, corralled by Bill Lerach, a lawyer, were aghast. 由律师BillLerach集结的众多起诉人则为此大为惊骇。
- Government tender urea must submit price by 18th noon. 政府招标尿素,须于18日正午前报价。