您要查找的是不是:
- 70m prefabricated box girder erection for Donghai Bridge 东海大桥70m预制箱梁架设施工
- box girder erection 架设箱梁
- Sum up experiences in the production of box girder. 就制作箱形梁总结制作中经验及体会。
- A Whole Span Box Girder Erecting Technology by Girder Erecting Equipment Going Through A Tunnel and Portal 整孔箱梁架桥机穿越隧道及隧道口架梁技术方案
- An Exploration of Design of Bridge Girder Erecting Equipment for Double Track Prefabricated Box Girder on High Speed Railway 高速铁路双线整孔预制箱梁架桥机设计方案探讨
- The main studying object is the transverse dolly of the box girder. 本论文主要研究的内容为:针对两侧箱梁横移车运动需要同步的要求,对箱梁横移车的推进液压系统及运动同步控制系统进行分析和设计。
- box girder transportation and erection 箱梁运架
- The scheme is a transition between the box girder with vertical piers and the true arch. 该结构是具有垂直墩的箱梁桥钢与真正的拱桥之间的一种过渡形式。
- The successful alternative was the cast-in-place segmental prestressed concrete box girder. 最后采用的方案是分段现浇的预应力混凝土箱形梁。
- Each bundle of strands is connected to one side of the center web of the two cell box girder. 每束钢缆锚固在双箱梁的中间腹板的一侧。
- The paper analyses the nonlinear cracking behavior of reinforced concrete box girder. 对钢筋混凝土箱梁受力开裂破坏的非线性机理进行了研究。
- girder erection crane with climbing capability 爬坡式架梁起重机
- This paper describes the construction techniques for incremental launching (hauling) erection of continuous steel box girders over multiple lines of electrified railways. 摘要介绍了跨越多条电气化铁路的连续钢箱梁拖拉施工技术。
- This paper introduces structure of waveform steel web prestress concrete box girder and construction method for several bridges. 介绍了波形钢腹板预应力混凝土箱梁的结构和几座桥梁的施工方法。
- TJ168 bridge girder erection machine TJ168型架桥机
- Construction technical of the elected bridge monolithic box girder was briefly introduced. 摘要简要介绍了城市轨道交通中运架一体式架桥机架设高架桥整孔箱梁的施工技术。
- Then the modem design method-optimum design to box girder is adopted by two methods (including finite element method). 用两种方法(包含有限元分析方法)对箱形梁桥架进行优化设计。
- In cross section the total deck width is1158 ft with the torsionally rigid spine box girder having a width of39 ft4 in. 横断面上,桥面总宽115.英尺,其中具有抗扭刚度的脊骨箱梁宽39英尺4英寸。
- This paper introduces the construction technique for hoisting prestressed concete box girder. 本文介绍了预应力箱梁的吊装施工技术。
- The multi-scale damage analysis method for steel box girder is presented with respect to Runyang Cable-stayed Bridge. 以润扬大桥斜拉桥为分析对象,提出了扁平钢箱梁结构的多尺度损伤分析方法。
