您要查找的是不是:
- Acceptance testing equipment for production of liquid propellant. 生产液体推进剂用的验收试验设备。
- Supervise commissioning of instrumentation and final loop acceptance testing. 监管仪表调试以及仪表控制回路最终测试验收。
- Final Acceptance Test of equipment and structures at supplier sites. 在供应商场地对产品进行验收。
- This standard does not specify a charge acceptance test at constant voltage. 本标准未规定恒压充电接受能力试验。
- The acceptance test is the last test prior to the deployment of software. 验收测试是在软件部署之前的最后的测试。
- Results of measurement during installation and acceptance test are also given. 另外还列出了该起重机安装验收时测得的一些技术数据。
- Performance Acceptance Test for Unit No.2 of Bainian Power Development Co. 百年电力公司2号机组性能考核试验
- It is also valuable for its stability monitoring and acceptance test. 这一测试过程和方法对机组的稳定性监测和机组的验收具有重要意义。
- The system integration and final acceptance testing of these equipment and facilities were completed in October. 整套管制系统的整合及最后验收工作也于十月完成。
- Ball screws. Part 3: acceptance conditions and acceptance tests. 球端螺钉。第3部分:合格条件和合格试验。
- Acceptance tests are run often and the score is published. 经常运行接受测试并且公布其结果。
- Hydraulic fluid power - Cylinders - Acceptance tests. 液力传动。液压缸。验收试验。
- If you re a diehard XP user, those should be your acceptance tests. 如果您是顽固的XP用户,这些应当是您的验收测试。
- RUP acknowledges four levels of testing: unit testing, integration testing, system testing, and acceptance testing. RUP确定了四级测试:单元测试、集成测试、系统测试和验收测试。
- This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station. 简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
- Acceptance tests typically test the entire system, or some large chunk of it. 验收测试通常测试整个系统,或系统中一些大的模块。
- The prime contractor conducts acceptance testing as part of the delivery of the subcontractor's software products according to a documented procedure. 主承包商管理承诺的测试,作为子承包商软件提交产品的一部分。
- This environment is where the final install and user acceptance test takes place. 最后安装和用户接受度测试在该环境中进行。
- I can't work out how much time it'll take, but I am very optimistic about the acceptance test. 虽然我说不准试验要花多少时间,但我对这个验收试验非常乐观。
- In charge of the various standard test stages such as integration, load, and acceptance test. 负责各类标准测试阶段,比如单元测试、集成测试、加载测试和验收测试。