- Research on face persistence ratio of side structural plane in abutment of arch dam 拱坝坝肩侧裂面的面连通率研究
- Gravity abutment of arch dam; 拱坝重力墩;
- abutment of arch dam 拱坝坝肩
- abutment of arch 拱座
- The unstable rock body with syncline structure on the right abutment of Danjiang arch dam are analyzed under the thrust from arch dam. 单江拱坝右坝肩存在一个向斜岩体结构,在拱坝推力作用下,有可能滑动破坏。
- A series of arches supported by columns, piers, or pillars. 拱形建筑物由柱、桥墩或台柱支撑的一系列拱
- By using the principles of structure mechanics, material mechanics, the paper proved that the maximum moments appears in the crown and the abutment of combined arch. 应用结构力学、材料力学理论,证明结合拱的最大弯矩发生在拱顶处,推导出承载拱厚度的计算式,从而建立了不稳定围岩巷道锚杆支护参数设计组合拱计算的理论模型。
- The use of arches or vaults in building. 拱形结构建筑物中拱及穹隆的使用
- Considering that the right abutment of Dongping arch dam is located at a narrow massif with high ground water, the problems about reservoir leakage and dam abutment stability are concerned with. 洞坪双曲拱坝两岸坝肩天然地下水位较高,右坝肩被河道切割临空而相对单薄且存在可能滑移体。坝址区渗流特性及两岸坝肩的稳定性是工程非常关心的问题。
- A series of arches supported by columns,piers,or pillars. 拱形建筑物由柱、桥墩或台柱支撑的一系列拱
- The stability of arch dam against elastic buckling has always been ignored. 摘要拱坝的抗屈曲稳定性一直是未被重视的问题。
- Overturning and sliding are seldom a factor in the design of arch dam. 拱坝设计中很少考虑倾覆和滑动的问题。
- The arch has a span of 60 metres. 那个拱的跨度为60米。
- Analysis of Seepage and Measures of Seepage Control Strengthening for Right Abutment of Shitouhe Reservoir Dam. 石头河水库大坝右坝肩渗漏分析及防渗加固措施。
- Emission joints of arch and vault shall correspond to direction of radius. 拱和拱顶的放射缝,应与半径方向相吻合。
- On the farther shore, overhung by a clump of elder bushes, we discern the stone abutment of the bridge. 在河的彼岸,我们可以看得见在接骨木排垂下的石质桥墩。
- Objective To study the effect of arch K needle on correcting flat funnel chest. 目的探讨抬举术中应用“弓形克氏针”治疗扁平胸型漏斗胸临床疗效。
- This study was designed to assess the risk of injury or abutment of the posterior tibial tendon with the placement of medial malleolar screws. 这一研究的目的在于评价内踝螺钉植入后,胫骨后肌建受到损伤或邻接的风险。
- The excavation of left bank abutment of the Hongjiadu hydroelectric project was the highest cut slope in the hydropower construction project then. 摘要洪家渡水电站左岸坝肩工程为当时水利水电建设工程中最大高度的边坡开挖。
- This paper presents the construction methods of mass concrete for main pier abutment of the Fourth Bridge on Xiangjiang in Xiangtan. 本文对湘潭湘江四大桥主墩承台大体积混凝土施工中的施工方法进行阐述,并对施工过程中应该注意的质量控制方法进行分析和总结。