ZHENG Jian-sheng,ZHANG Ke-ping,ZHANG Li-feng.Inrushing of the bottom for confined water pit foundation and its treatment method[J].Tunnel Construction,2003,25(5):25-27.

 
  • [5]郑剑升;张克平;章立峰.;承压水地层基坑底部突涌及解决方法[J]
今日热词
目录 附录 查词历史