Top Roping: Free cpmbing a route that has the safety rope attached to the top of the cpmb (usually one walks to the top to set up the top-rope belay).

 
  • 上方确保:在已从顶端架好确保绳的岩壁上做平衡攀登(通常可先走到上方架设固定点)。
今日热词
目录 附录 查词历史