To solve rescheduling problem for semiconductor wafer fabs effectively, a swarm-intelligence-based complete modification rescheduling method was proposed.

 
  • 基于群体智能思想,提出了全局修正式半导体生产线重调度方法。
今日热词
目录 附录 查词历史