To ensure the heightening engineering of tailing dam to successfully carry through, siphonic drainage system was adopted to lower the phreatic line in the dam.

 
  • 为保证尾矿坝加高工程的顺利实施,采用虹吸排渗系统来降低坝体内部的浸润线高度。
今日热词
目录 附录 查词历史