This article describes the successful spiral case preassembly with a dummy stay ring for the manufacturing of the 550MW hydrogenerating units of Ertan Hydro Power Station.

 
  • 二滩水电站550MW水轮发电机组在制造过程中,采用工艺座环预装涡壳,这在国内尚属首例。