There is way named oil taking in vacuous pipe commissioning on basis of the actual case of the west crude oil pipeline.

 
  • 依据西部管道原油管道的实际情况,分析判断出了该条管道投产必须使用空管投油投产的方式。
今日热词
目录 附录 查词历史