Then, we consider an n-job, m-machine lot streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness.

 
  • 接著,我们考虑一个在n件工件及m部机器下,批量流在流程型工厂之排程问题,其目标是最小化总加权提早及延迟时间。
今日热词
目录 附录 查词历史