The problems existing in the operation of the vibrating strike hammers of electrical precipitator in Huaneng Beijing Thermal Power Plant and the possible reasons are analyzed.

 
  • 通过对华能北京热电厂机组的电除尘器振打锤在运行中发现的问题及其原因进行分析,提出了有效的改进方法。
今日热词
目录 附录 查词历史