The paper combines the iterative and increasing model of reengineering to the practice, outlines the general reengineering scheme, using the project of medicare charge system of Jiangxi electric power corporation as the application object.
英
美
- 本文以本人参与的江西省电力公司医疗保险缴费报销系统的项目为应用实例,将再工程的迭代、增量模型运用于实践中,提出了总体的再工程方案。