The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in Heihe Water Control Project has a significant effect upon the construction quality and the cost of the project.

 
  • 摘要黑河水利枢纽右岸溢洪洞进口引渠右岸边坡的开挖方案,是影响该工程质量和造价的突出问题。
今日热词
目录 附录 查词历史