The completion of the foundation buried stone heads, four measurements, a flat wire measurement, substandard level of measurement, map the root control field data collection and data editing.

 
  • 完成了基础埋石、首级四等测量、一级平面导线测量、等外水准测量、图根控制等野外数据采集以及数据编辑工作。
今日热词
目录 附录 查词历史