Testing results are applied to subgrade embankment of the Zhaoshan Road in Xiangtan city,and construction measures of the embankment of clay in 95 area,wetting embankment and increasing compaction degree of the filling in 90 area are put forward.
英
美
- 将试验成果用于湘潭市昭山大道路基填筑,提出了路基95区换填黏性土、湿法填筑和提高90区压实度等施工措施。