Tab to test the predictive accuracy of a single mining model, or to compare the effectiveness of multiple mining models contained within a mining structure.

 
  • 选项卡测试单个挖掘模型的预测准确性,或比较挖掘结构中包含的多个挖掘模型的效率。
今日热词
目录 附录 查词历史