您要查找的是不是:
- A test run would be useful to the statisticians. 试运转将对统计学家有用。
- Is this equipment tested for mechanical aptitude? 这台设备测定了其机械适应性了吗?
- Connect to test rig and prepare for test run. 连接到测试装备和准备测试。
- The result of the test run satisfied us. 试车结果使我们很满意。
- You can also execute a test run of these objects. 您还可以对这些对象执行测试运行。
- Under Test Run, click one of the test run links. 在“测试运行”下,单击某个测试运行链接。
- The test or the test run timed out. 测试或测试运行超时。
- The test run might have a time-out value assigned. 测试运行可能会分配有一个超时值。
- The tester stopped the test run. 测试人员停止了测试运行。
- This stops the test run at its current location. 这将使测试运行在其当前位置停止。
- Shall we begin the test run at once? 我们立即开始试车好吗?
- This paper presents the principle of TSOA/AOA passive positioning with single equipment. 采用非线性模型对移动台的运动状态进行了描述。
- ARPG typical game, yes, the test run very smoothly! 典型的ARPG游戏,不错,经测试运行非常流畅!
- Economic flow rate derived from the economic design conventionally for single equipment or pipe exists some limits. 传统的单个设备或管道的经济设计导出的“经济流速”有一定局限性。
- This is the only serious damages of any of the equipment tested. 这是检验过的设备中唯一受到严重损坏的一件。
- After you run a single test or several tests, you can repeat the test run. 在运行一个测试或多个测试后,可以重复测试运行。
- Due to its high level of precision, stability, safety and efficiency. It is an ideal machine for micro-motor production line or single equipment manufacturing. 本机精度高,性能稳定,操作方便,安全可靠,生产效率高。是微型电机生产线上(或单机)大批量生产的理想配套设备之一。
- In both cases, the data of a single test run is stored in a file with the. Trx extension. 在这两种情况下;单个测试运行的数据都会存储到一个扩展名为.;trx的文件中。
- The function of the Extended OAM procotol is to provide the interface for developping most of the second layer protocol and equipment test on switch. OAM扩展的功能主要是为一些二层交换机协议的实现以及用户端设备测试等功能提供了必要的接口。
- Right-click the test run in the list and click View Results. 在列表中右击测试运行,然后单击“查看结果”。
