Prior to the operation of the closed low flow drainage system, the Permit Holder shall provide a temporary drainage system to collect rainfall and irrigation water to the reservoir.

 
  • 在密封低流量排水系统运作前,许可证持有人须提供一个临时的排水系统,以收集雨水及灌溉用水至水塘。
今日热词
目录 附录 查词历史