您要查找的是不是:
- Acceleration parameter is very important for train control system. 列车加速度对运行控制系统极为重要。
- Centralized train control system is an advanced train control system supporting new type of train operation organization. 调度集中是一种先进的行车指挥系统,支持新的行车组织方式。
- And 8, the same line, also used on the 7th line of the Commonwealth by the Alcatel wireless communications-based train control system (CBTC). 和8号线一样,7号线也采用由阿尔卡特联合体提供的基于无线通信的列车控制系统(CBTC)。
- It was put forward strategies of developing Chinese Train Control System(CTCS) based on demands of the actual state of affairs and requirements for railways. 基于我国铁路发展需求,铁路部门提出发展适于我国国情的CTCS(列车运行控制系统)的策略。
- New SELTRAC train control system ordered for the whole railway. New fleet of trains ordered. 预定了新的SELTRAC列车控制系统,以及新列车队伍,为整个网络服务。
- New Automatic Train Control System in Japan 日本东海道新干线采用的新型列控系统
- European Train Control System (ETCS) ETCS
- Incremental Train Control System 增强型列车控制系统
- Keywords construction vehicle;wheel loader;power train system;intelligent gearshift;human simulating intelligent fuzzy;control system; 工程车辆;轮式装载机;动力传动系统;智能换挡;仿人智能模糊;控制系统;
- Design and implementation of automatic train control system 列车自动控制系统的设计与实现
- Evaluate the quality level for power train parts supplier. 对动力传动件供应商的质量水平评估。
- High Reliable Design of CAN Bus Interface in Train Control System 列控车载设备中CAN总线接口的高可靠设计
- Deal with power train parts issues in the product process. 处理生产过程中的动力传动件质量问题。
- Train Control System Based on Radio Communication 基于无线通信的列车控制系统
- The elastic central theory and the energy uncoupling method are applied to optimize the design for the power train's mounting system. 综合运用弹性中心理论和能量解耦方法对动力总成悬置系统进行了优化设计。
- communication based train control system(CBTC) 基于通信的列车控制系统
- Compile and conduct the performance testing plan for power train parts. 制定并实施动力传动件性能检测计划。
- Power control unit is the key part of control system. 功率控制单元是控制系统的核心部件。
- Preside over quality rejection and quality effect of power train parts. 负责动力传动件的质量拒收和质量验证。
- New section of Shijiazhuang-Taiyuan passenger dedicated line adopts Interlocking &Train controls System (referred to as SEI system) which has been applied on Qin-Shen passenger dedicated line. 石太客运专线新线区段采用SEI列控联锁一体化系统(简称SEI系统),该系统已应用在秦沈线。
