Operation of Gezhouba Dam had led bed degradation and decrease of water level in the dry season in the downstream of the project.

 
  • 摘要葛洲坝下游河床冲刷下切及枯水位下降,为保护河床和遏制枯水位下降,拟采用河床护底加糙措施。
今日热词
目录 附录 查词历史