On similar projects, with 50m span length (single spans, cantilevering 1/5), the cycle time is usually approx. 10 - 12 days without steam curing, reinforced in-situ by hand.

 
  • 类似项目50米跨(单线,1/5悬臂)没有使用蒸汽养生和预制钢筋笼,一个工作循环为10-12天。
今日热词
目录 附录 查词历史