- In this article,the CPM and priority network planning techniques used in flow construction management are discussed in order to give a refererce to the practical civil engineering. 文章介绍了采用普通网络(CPM)和优先网络计划技术表达流水施工进度的基本方法、特点,介绍了两种网络计划中的时间参数表达和计算并举例加以说明,期望能在实际工程管理中加以参考和应用。
- It introduces the development and application of traditional network planning technique based on CPM and PERT. 介绍了传统网络计划技术CPM和PERT的发展及应用。
- Application of network planning technique in installation works of hydropower structures is presented here. 摘要介绍了网络计划技术在水电站建筑安装工程中的应用。
- The principle of network planning technique and network chart drawing method are illustrated and compared with Gantt chart analysis method in this paper. 摘要介绍了网络计划技术的原理和网络图的绘制,并与传统的甘特图分析方法进行了比较。
- The construction project of power plants is a altitudinal integrate systemic work,Theimplementation of network planning technique and Construction management System willimprove efficiency greatly. 电厂基建项目是一个技术高度密集的综合性系统工程,应用网络计划技术,建立电厂基建管理系统将使得电厂基建项目效率得到提高。
- General program of network planning techniques used in project management 网络计划技术在项目计划管理中应用的一般程序
- dynamic network planning technique 动态网络规划技术
- Keywords CCPM;network planning technique;scheduled plan; 网络计划技术;进度计划;
- Application of Network Planning Technique in Project Schedule Management 网络计划技术在项目进度管理中的应用
- Network planning techniques 网络计划技术
- Network Plan Technique is in Bigly Fixed Work Period Control of Application 网络计划技术在大修工期控制中的应用
- Finally, the ideology of URT network planning is concluded. 概括了路网规划的主题思想。
- An Approach of Fuzzy Network Planning Technique Applied into Aerospace Experiment 应用于航天试验的模糊网络计划方法
- Application of Fuzzy Network Planning Technique in the Construction of the Water Conservancy Project 模糊网络计划技术在水利工程施工中的应用研究
- Network Planning Technique in Consideration of Two Types of Dependency Relationship Among Activities 考虑工序间两类依赖关系的网络计划方法
- Applying network planning technique and enhancing the production efficiency of crude salt 应用网络计划技术,提高原盐生产效率
- Study on network planning technique considering activities circumstance-based factors'correlation 考虑工序间环境相关性的网络计划方法研究
- "The intensie treatment inoled remoal of plaque through scaling and root planning techniques, as well as extraction of teeth that could not be saed. “强化治疗包括采用刮治和根面平整技术去除菌斑,以及拔掉那些不能再保留的牙齿。
- Work along with Head MSP Network in the implementation of network plan. 负责在分公司执行总公司发展战略和经营战略;
- By applying some nonlinear programming techniques, the single layer solution procedure for CATV network planning problems is developed.Some computational experiments are described and explained. 有线电视网路规划的单层解题程序:传统的网路规划方法仅考虑网路讯号品质的追踪与计算,对于所规划的网路成本并未能进行最佳化调整。