您要查找的是不是:
- Material Annex Line Item Progress Report 器材附件册列项目进展报告
- Material Annex Line Item 器材附件册列项目
- Procurement Annex Line Item 采购附件线性项目
- You really want a line item for every day. 您实际需要每天有一行项目。
- These funds must be carried over in the same budgeted line item. 为此,香港六合彩时常感到自卑,有时甚至感到绝望。
- Each record in the Order Details table represents one line item on an order. “订单明细”表中的每条记录都代表订单上的一个行项目。
- The Order ID is repeated for each line item on an order, so the field doesn't contain unique values. “订单ID”对订单上的每个行项目都会重复,因此该字段并不包含唯一的值。
- Each order can have more than one line item, but each line item is connected to only one order. 每个订单可以具有多个行项目,而每个行项目仅与一个订单相关。
- Department of the Army Material Annex 陆军部器材附录
- Unit pricing should be extended by the quantities quoted to form the line item total. 单价应当连同报价数量等,形成完整项目进行提交。
- Above the line (item) A customary balance-sheet or revenue-or-expense position in a financial statement as compared to a below the line item. 线上(条目)财务报表中常规的资产负债或损益状况。相对于线下条目而言。
- "Delivery Date" and/or “Dock Date” shall mean the date the Purchase Order line item is required to arrive at Buyer's facility. “交货日期”或者“到岸日期”的含义都是指定单条款里所要求的时间,即“到达买方的运输工具上的时间”。
- Some examples of operands include the identification of a customer placing an order or the SKU number for a line item within the order. 在最简单的形式中,操作数作为消息中的参数。
- Invoice Instructions: invoices must identify the pruchase order and line item WBS numbers applicable to the amounts being invoiced. 发票要求: 发票要确保订单号和每个项目的WBS编码要与发票的金额相符。
- Below the line (item) An out-of-the-ordinary revenue or expense item or a nonrecurrent item requiring a separate entry in a balance sheet. Compares to above the line item. 线下(条目)一项需要在资产负债表中单独列出的非常规收入或支出帐目,或非经常性帐目。相对于线上条目而言。
- Ariba application can then dynamically generate a thumbnail size image, even if a thumbnail image is not provided, to show next to the line item in the catalog. 然后,即使没有提供缩略图图像,Ariba应用程序也会动态生成一张小尺寸图像,以在目录中行项目的旁边展示。
- The material is flawed throughout. 这种材料到处是裂缝。
- Road transport for years built 20 kilometres, a pilot rapid transit network BRT line item to optimize Gongjiaoxianwang, effectively implement public priority strategies. 年内建成20公里公交专用道,启动快速公交网BRT试验线项目,推进优化公交线网,切实落实公交优先战略。
- Most governors have the power to veto line items of the proposed state budget. 许多州长有权反对州预算法案提案的项目
- Material Annex Item 器材附件项目
