In this verification, the data paths are full covered and the controlling paths are covered with high coverage rate.The simulation result indicates that the design of this FPU meets the demands.

 
  • 整个验证过程实现了对数据通路的全覆盖,同时对控制通路也有很高的覆盖率,模拟结果表明该FPU的设计满足要求。
今日热词
目录 附录 查词历史