In the test for voltage regulator, the load current of the DUT provided by the test equipment needs a certain delaytime to reach the provision value.

 
  • 在电压调整器测试中,测试设备提供的负载电流需经一定的时间延迟才能达到预定值。
今日热词
目录 附录 查词历史