In the process of a drawing management of stope by sublevel caving method,the stoppedtime of drawing operation is determined based on two-indexes of both drawing volume and cut-offgrade.

 
  • 在无底柱分段崩落法的采场出矿管理中,采用出矿量和截止出矿品位两个指标来确定放矿截止时间。
今日热词
目录 附录 查词历史