In consideration of the atomization of water jets released from the reservoir,both side slopes of the plunge pool are protected by shotcreting and prvided with system anchor rods and drain holes.

 
  • 结合泄洪雾化分析计算,对水垫塘两侧水上边坡采用喷混凝土保护,并设置系统锚杆和排水孔。
今日热词
目录 附录 查词历史