In addition, because of the large pipe diameter, more bore expanding levels are needed, and it interferes with stratum by impact.

 
  • 加之穿越管径大,扩孔级数较多,对地层的冲击扰动较大,增加了塌孔的可能性,施工难度很大。
今日热词
目录 附录 查词历史