In Fig. 16 details are given of the propping arrangement with central rows of driven steel piles, as used during the excavation for a four-track underground station in Hamburg.

 
  • 图16所示为开挖建设汉堡地下四车道车站时使用的支撑系统,采用了中间打入数排钢桩的设计。
今日热词
目录 附录 查词历史