您要查找的是不是:
- Repairing technical requirement for steel pile col. 绞吸式挖泥船钢桩卡箍修理技术要求。
- Repairing technical requirement for steel pile of. 绞吸式挖泥船钢桩修理技术要求。
- Abstract: Determining nip point is important for steady rolling section steel. 文摘:确定型钢轧制时轧件的咬入点对实现稳定轧制有重要意义。
- I have a huge pile of letters to deal with. 我有一大堆信件要处理。
- Design and devlopment of walking-beam reheating furnace of Beam Section Steel Plant in Anshan Iron and Steel Co. 鞍钢大型厂步进式加热炉设备设计与开发。
- Construction layer top will use scaffolding steel pile to pull in and out side scaffolding. 3施工层顶端用脚手架钢管拉结内外脚手架。
- Technology characteristics and production current situation of medium section steel of Laiwu Iron and Steel Co., Ltd. 莱钢中型型钢生产现状及工艺特点。
- Of course. Plate,sheet and various kinds of section steels. 当然可以。各种中厚板和薄板,以及各种型钢。
- Note:Section steel can be as per supplied samples,drawings or complying with other international standards. 备注:我公司可以根据来样、来图或根据其他国际标准供应槽钢。
- Of course. Plate, sheet and various kinds of section steels. 当然可以。各种中厚板和薄板,以及各种型钢。
- In the introduction, the meaning of researching the developmental strategies of Section Steel Mill of Tisco is showed. 首先在前言部分说明了研究太钢型材厂发展战略的现实意义。
- This paper presents an automatic stowing,packing and gathering system for a section steel tandem rolling line. 介绍一种用于精整工艺的自动化型钢码垛包装收集系统。
- I bet they are making a pile out of the deal. 我肯定他们这笔生意一定赚大钱。
- I cannot cope with such a pile of work. 我无法处理这么多工作。
- Cantilever racking: special section steel post, high strength cantilever, it's mainly used for storaging long goods such as steel tube, etc. 悬臂式货架:专用型材立柱,配高强度悬臂,适于存放各种长形物料,如型材、管材、板材等。
- This system adopts parametric programming method to program and output CNC cutting program for various interface ports of H-type section steel. 该系统采用直观、方便的参数编程方法,可以编写和输出H型钢各类型接口端头的切割程序。
- I've got a pile of sewing to do. 我有很多东西要缝。
- Disposing welding section steel cross bridging in the slab-column system is a good means to avoid disposing abaci and elevating shear resistance. 合理设置型钢剪力架是避免设置柱帽和板托,同时有效提高板柱节点抗冲切承载力的最受欢迎的有效手段。
- D.. Tholing stupas, Cave 79 of I section, Piyang site and the Malakartse Khar stupa belong to this second phase. 托林寺佛塔、皮央I区79号石窟和玛拉卡则卡尔佛塔是属于这一时期的遗存。