您要查找的是不是:
- THE SEEPAGE AND STRUCTURE RECHECK OF SAFETY APPRAISEMENT OF THE GROUTED RUBBLE GRAVITY DAM ON HUTANG RESERVOIR 湖塘水库浆砌石重力坝安全鉴定中的渗流、结构复核
- Grouted rubble gravity dam 浆砌石重力坝
- THE SUBSTITUTION METHOD OF TESTING THE APPARENT DENSITY OF THE DAM BODY OF GROUTED RUBBLE GRAVITY DAMS 浆砌石重力坝坝体容重测试的参考求法
- MENDING THE WATER DAMAGE ENGINEERINGS BY TAKING THE GROUTED RUBBLE GRAVITY WALL TO FASTEN OLD DAM 用浆砌石重力墙加固旧坝体修复上海圹坝水毁工程
- THE NO-SPREAD GROUT CONSTRUCTION METHOD ON THE GROUTED RUBBLE DAM 浆砌石坝不铺浆法砌筑施工
- However, some old gravity dams were not grouted well, even not grouted at all due to some historical reasons. 但是,由于历史原因,一些现役的老坝,其纵缝在建造初期没有设置键槽、灌浆不善甚至没有进行灌浆处理。
- APPLICATION OF THE GROUTED RUBBLE DIAPHRAGM-TYPE RIND DAM IN DAHEKEN RESERVOIR 浆砌石隔墙式硬壳坝在大禾坑水库中的应用
- Studies on hydraulic fracture of high concrete gravity dam were carried out with the interface model developed. 同时,利用所建立的考虑缝面水压的接触面模型对高重力坝坝踵水力劈裂展开了初步研究。
- The first use of high pressure jet and wash technology in foundation treatment of gravity dam is presented. 文中介绍了高压喷射冲洗工艺首次在我国重力坝基础处理上的应用。
- By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured. 采用高压旋喷注装进行止水防渗处理后,地下水得到了有效的控制,保证了基坑进一步开挖和装砌块石护坡方案的顺利施工。
- So the author opens out the system of Gravity dam CAD in ObjectARX and VBA on the base of AutoCAD 2000. 所以作者设计重力坝 CAD系统的开发是利用 ObjectARX、VBA对 AutoCAD 2000进行的二次开发。
- By adopting jet grouting,ground water was controlled effectively,and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured. 采用高压旋喷注浆进行止水防渗处理后,地下水得到了有效的控制,保证了基坑进一步开挖和浆砌块石护坡方案的顺利施工。
- Firstly, according to the actual structure of gravity dam, three dimensions substance geometry model is built with Pro/Engineer. 首先,根据重力坝的实际结构,应用Pro/Engineer建造其三维实体几何模型。
- It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth-fill embankment dam. 还要考虑到可能的备选方案,比如是选择混凝土重力坝还是选择填土筑堤大坝。
- The Tuka hydropower project is a medium-sized hydropower development with a roller compacted concrete gravity dam in Yunnan province,China. 云南土卡河水电站是一个中型水电工程,拦河坝为碾压混凝土重力坝。
- Wushe reservoir has a gravity dam with a linear shape and thick base. 6.Atop the dam is a water outlet to relieve flooding. 7. 图5:雾社水库采用混凝土重力坝,坝型呈直线,底厚上薄,重心在坝底,图6:雾社水库坝顶排洪道。
- The concrete in concrete gravity dam,especially in RCC dam,is a stratified structure,so that its stratification feature is key to the safety of concrete dam. 在混凝土重力坝尤其是碾压混凝土坝中,混凝土为成层结构,因而层面特性对混凝土坝的安全至关重要,个别坝段水平薄弱面的存在对混凝土坝的整体安全性有重要影响。
- A method for analyzing aseismic reliability of gravity dam is put forward in this paper. It is significant in theory and practice and is very convenient. 本文介绍了一种重力坝地震动力可靠度分析方法,方法简便适用,具有一定的理论和实际意义.
- Some statistic laws are discussed about the gravity dam's seismic responses of accelerations and stresses changing with the dam height and the foundation stiffness. 同时分析了重力坝地震响应加速度和动应力随坝高和坝基刚度变化的统计规律。
- The structure of the dam body and the diversion waterway of the 21st monolith of Longtan Roller Compacted Concrete(RCC) Gravity Dam is analyzed based on 3-D finite element method. 采用三维有限元法,对龙滩碾压混凝土重力坝21坝段坝体及引水道组合结构进行了分析。