For high permeability and loose sand in bohai, these links are composed of wire wrapped screen, gravel packing zone, perf, skin and near wellbore undisturbed formation.

 
  • 具体到渤海高渗透疏松砂岩,这些环节包括绕丝筛管、砾石充填层、射孔孔眼、压实带及近井原状地层。
今日热词
目录 附录 查词历史