Following delivery to site, columns will be re-assembled and fully welded. Ideally this final assembly should occur within, or close to, pick-up radius of the erection crane.

 
  • 随着支柱被交付到施工场地内,它要被重新装配和完全焊接。理想地说,支柱的最后装配应该发生在室内,或者是停止装配,安装用起重机的半径。
今日热词
目录 附录 查词历史