您要查找的是不是:
- Interim Technical Order Field Change Notice 临时技术指令野外更改通知
- Field Change Notice 换场通知
- When the State field changes, the State Change Count is set to 1. 当“状态”字段更改时,State Change Count(状态更改计数)会设置为1。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- With the condensation shock, the parameters and the structure of the flow field change dramatically. 经过与凝结激波的相互作用后,流场参数和结构将发生明显的变化。
- So,it is very significance to study seepage field change before and after reservoir built. 因此,水库蓄水前后地下水渗流变化规律具有十分重要的意义。
- This is where a magnetic field changes shape and bumps into itself. 这就是磁场改变了形状然后向本身内部撞击。
- At the airgap, magnetic field change is analysed through two-dimensional analytical method and two-dimensional finite-element method. 通过二维解析法和有限元法分析电动机不同气隙时的气隙磁场变化。
- Review and follow-up process change notice, engineering deviation authorization and material review board recording after engineering reviewed. First article evaluation for new material. 在工程评审后,评审和跟进工序变更通知单,工程偏离认可单和物料评审单。新物料首样认证。
- When rotating the magnet, the distribution of the magnetic field change,the direction of magnetic force line change accordingly. 当磁铁旋转时,磁场分布变化,磁力线走向也随之改变。
- Through comparsion of two methods, conclusion of magnetic field change is obtained.This paper may supply referrence for investigation and design of the motor. 通过以上两种方法的比较,得出气隙磁场变化的结论,可供研究设计该类电机的人员参考。
- The total trends of regional gravity field change show a positive gravity change between Qicun and Tancheng depressed area, and a negative change in Mengyin uplifted area. 区域重力场总的趋势变化为齐村至郯城坳陷区-带重力正值变化,蒙阴隆起区-带重力负值变化。
- By use of Community Starter Kit,a website with functions of appraisal,user voting,uploading the quota,changing notice and subject is introduced in this paper. NET starter K it进行了描述,并用其中的Community starter K it构建了一个具有评价、用户投票、上载配额、更改通知和主题的W eb站点。
- TECN Temporary Engineering Change Notice 工程规格暂行变更单
- QCN Quality Control Change Notice 品管规格变更单
- Any rules that occur when the value in this field changes will be listed in this category. 任何在此域中的值发生变化的情况下出现的规则将列在此类别下。
- Post Project Review Engineering Change Notice 工程变更通知书
- If the field changes slowly, we can replace the time integral by a line integral over the unperturbed orbit. 如果场缓慢改变,我们能够用未扰动轨道的线积分来代替时间积分。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- In the time domain, the self-potential anomaly emerged first and ULF magnetic field changes arose then. 在时间序列上先出现自电位异常,然后是超低频磁场的变化;
